PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

laying out block along column line 3.3 between H-K.jpg Laying out block at the 2nd floor UCIA Facing North.jpg STarted installing the main raiser at the 3rd floor Facing North.jpg Storm piping for the low roof Facing South.jpg Waste and vent piping at the 4th floor Facing North.jpg
Previous page Waste and vent piping at the 4th floor Facing North
Waste and vent piping at the 4th floor Facing North